Production

Make goods out of other goods - bills of materials, routes, work centres, assembly orders and what it costs to make each item.

Production covers goods you make or assemble yourself from components you hold in stock: a gift box packed from its contents, a cabinet built from panels and fittings, a blended product made from raw materials. It is built on inventory: the item you make and every component are goods whose stock is followed.

A bill of materials says what goes into a batch of an item. A route says the steps it goes through, each at a work centre with a cost per hour. An assembly order makes it: the components leave stock at what the books hold them at, the finished item arrives at that cost plus the work, and the work is posted to the ledger. Costing shows what an item costs to make before you make it.

The Production dashboard shows the assembly orders and units made this month, the cost this month and this year, the active bills of materials, and the production cost by month.

  1. 1Work centresWhere work is done, and its rate
  2. 2RoutesThe steps and their times
  3. 3Bills of materialsWhat goes into a batch
  4. 4CostingWhat it will cost
  5. 5Assembly orderComponents out, goods in

Before you start

  • The Production module is switched on for the company. It is off unless you switch it on. See Modules.
  • Inventory is set up: a costing method, at least one location, and the item you make and its components set to Goods with Follow its stock ticked.
  • If your work centres carry a cost per hour, the chart has an account to absorb that cost into, usually a production overheads absorbed account.