Bills of materials
Say what goes into making an item, for a batch of a given size, and the route it is made by.
A bill of materials lists what goes into making an item: the components and how many of each, for a batch of a given size. It also names the route the item is made by, so the work is costed as well as the materials. An assembly order starts from a bill of materials and scales it to the quantity being made.
A component can be an item you make yourself, with its own bill of materials. Costing then rolls its cost up through it.
Before you start
- The item you make and every component are items set to Goods with Follow its stock ticked. Other items are not offered, and are refused if named.
- The route, if you use one, exists.
- You hold the Accountant role or higher.
Create a bill of materials
- Go to Production › Bills of materials and choose New bill of materials.
- Enter a Code and a Name.
- Choose the Item made.
- Enter the Batch size: how many the components below make. It defaults to 1.
- Optionally choose the Route.
- Under Components, add each component with its Qty for the batch. The Unit shows the component's unit.
- Choose Add component for more, and Remove to take one out.
- Choose Save.
From a saved bill of materials, See its cost opens Costing for it.
Fields
| Field | What to enter |
|---|---|
| Code | Up to 20 characters, saved in capitals. Must be unique. |
| Name | What the bill is called. |
| Item made | The finished item. It cannot also be one of its own components. |
| Batch size | How many the components below make. Above zero, up to four decimals. |
| Route | The steps and work centres it is made by. Without one, only the materials are costed. |
| In use | Only bills in use are offered on assembly orders and in costing. |
| Components: Component | A tracked item. Each needs a quantity above zero. |
| Components: Qty | How many of it the batch uses, up to four decimals. |
A bill of materials needs at least one component.
Example
A gift box item made in batches of 10, with a route for packing:
| Component | Qty |
|---|---|
| Box | 10 |
| Dates 500 g | 20 |
| Ribbon (metre) | 5 |
An assembly order for 25 gift boxes needs 25, 50 and 12.5 of each.
Note
A bill of materials cannot use itself, directly or through its components: if a component's own bill of materials leads back to the item made, saving is refused.
What it posts
Nothing. It is used when an assembly order posts.
Correct or change it
Saving a bill of materials replaces its list of components. Changes apply to assembly orders and costing from then on; assemblies already posted keep what they used. To make something different for one order only, change the components on that assembly order instead; the bill itself is not touched. Bills of materials cannot be deleted; untick In use instead.
Related articles
- RoutesList the steps an item goes through to be made, each at a work centre, with setup time per batch and run time per unit.
- Post an assembly orderMake goods from a bill of materials - the components leave stock, the finished item comes in at their cost plus the work, and the work is posted.
- Production costingSee what it costs to make any quantity of an item - each component at what it is held at, plus the time at each work centre - before you make it.
- Set up itemsAdd the goods and services you buy and sell, with their default prices, accounts and tax code, and choose which goods have their stock followed.