Make goods to stock
The production process end to end - set up work centres, routes and bills of materials, cost the item, assemble it, and sell what you made.
Making to stock turns components you hold into finished goods you can sell. At the end of it the components are out of stock, the finished goods are in at what they cost to make, and the cost of the work done has moved from your overhead accounts into the value of the stock.
- 1Work centresRate per hour, absorption account
- 2RoutesSetup and run time per step
- 3Bills of materialsComponents per batch
- 4CostingCheck the cost first
- 5Buy componentsComponents into stock
- 6Assembly orderMake the goods
- 7Sales invoiceSell what you made
1. Set up work centres
A work centre is where work is done (a line, a machine, a bench) and what an hour of it costs. Give each one a Cost per hour and the Absorb into account that is credited as goods are made. A work centre with no cost per hour adds time to a route but no cost.
Nothing is posted.
2. Set up routes
A route lists the steps an item goes through, in order, each at a work centre, with Setup (min) once a batch and Run (min/unit) for each unit. Routes are optional: without one, only the materials are costed.
Nothing is posted.
3. Set up bills of materials
A bill of materials names the Item made, the Batch size, the Components for that batch, and the Route. The item and its components must be goods whose stock is followed. A component can itself have a bill of materials.
Nothing is posted.
4. Check the cost
Costing shows what it would cost to make any quantity: each component at what it is held at, and the time at each work centre. Use it to set a selling price or to spot a component with no cost.
Nothing is posted.
5. Buy the components
Components come into stock like any other goods, on a purchase invoice, at what you paid. The assembly order later takes them out at what the books hold them at, by the company's costing method.
6. Make the goods
Post an assembly order: choose the bill of materials, the quantity to make and the location. It posts at once:
- The components leave the location at what the books hold them at.
- The finished item comes into the location at the material cost plus the work.
- The work is posted: Inventory debited, each work centre's absorption account credited.
The components' value only moves from one shelf to another within inventory, so it posts nothing in the ledger; only the work is new value.
7. Sell the goods
The finished item is now ordinary stock. A sales invoice takes it out at what the books hold it at, which comes from what it was made at, and charges that to Cost of Goods Sold. Your margin on it is the selling price less materials and work.
Check it
Stock valuation should still show the stock and the Inventory account in agreement: an assembly writes its movements and its entry together.
Related articles
- Post an assembly orderMake goods from a bill of materials - the components leave stock, the finished item comes in at their cost plus the work, and the work is posted.
- Bills of materialsSay what goes into making an item, for a batch of a given size, and the route it is made by.
- Production costingSee what it costs to make any quantity of an item - each component at what it is held at, plus the time at each work centre - before you make it.
- How stock postsWhich documents move stock, which way, at what cost, and the journal entry each one makes alongside its stock movements.
