Next e-invoicing deadline: Businesses with revenue of AED 50 million or more must issue e-invoices from 1 January 2027.

Read the guide
Contents

Post an assembly order

Make goods from a bill of materials - the components leave stock, the finished item comes in at their cost plus the work, and the work is posted.

An assembly order records goods made. It starts from a bill of materials, scaled to the quantity you make, and posts the moment you choose Assemble: the components come out of the location, the finished item goes in, and the work is posted to the ledger. There is no draft.

Before you start

  • An active bill of materials exists for the item. Without one the screen says Add a bill of materials first.
  • The components are in stock at the location, unless Allow stock to go below zero is ticked in Inventory settings.
  • Every work centre on the route with a cost per hour has an Absorb into account.
  • The chart has the Inventory account.
  • You hold the Accountant role or higher.

Create the assembly order

  1. Go to Production › Assembly orders and choose New assembly order.
  2. Choose the Bill of materials. Its components are fetched below, scaled to the quantity.
  3. Enter the Quantity to make. The hint confirms what it makes, such as Makes 25 × GB-01 Gift box.
  4. Check the Date and the Location: where the components are taken from and the goods put.
  5. Optionally enter a Narration. Left empty, the order is narrated with the item code, quantity and bill of materials code.
  6. Check the Components. For this order only, you can change any Needed quantity, Remove a component, or Add a component. A changed order shows Changed from the bill; Fetch from the bill again puts the bill's components back.
  7. Choose Assemble.

Important

An assembly order posts at once and cannot be edited. To undo it, reverse it.

Fields

Field What to enter
Bill of materials The bill to make from. Only bills marked In use are offered.
Quantity to make How many of the item to make. Above zero, up to four decimals.
Date The date of the order. It must fall in the company's fiscal calendar, and in an open period when work is posted.
Location Where the components are taken from and the finished goods put. Starts on the default location.
Narration Optional note for the order and its journal entry.
Components: Component Each component, from the bill or added for this order. A component can be listed only once.
Components: Per the bill The bill's quantity, scaled to the quantity you make.
Components: Needed What this order uses. Change it for this order only; the bill itself is not touched.

What it posts

Stock movements. Each component leaves the location at what the books hold it at (the location's average cost, or the oldest layers under first in, first out). The finished item comes into the location at the material cost plus the work, so its unit cost is that total divided by the quantity made.

Journal entry, for the work only. The components' value only moves from one shelf to another within inventory, so it posts nothing. The work is new value: Inventory is debited with it, and each work centre's absorption account is credited with its share.

For 25 gift boxes using components held at AED 1,850.00, and a packing step costing AED 112.50:

Account Debit Credit
Inventory 112.50
Production overheads absorbed 112.50

The 25 gift boxes come into stock at AED 1,962.50, AED 78.50 each.

If no work was costed (no route, or work centres with no cost per hour), no journal entry is made and the order shows No work was costed, so nothing was posted to the ledger.

The order page shows the Qty, Materials, Work, Total cost and Unit cost, What moved (every movement, components out and the item in), and a link to the Journal entry.

Statuses

Status Meaning
Posted The goods are made: components out, item in, work posted.
Reversed Undone. The goods made went back out and the components came back in.

Correct or cancel it

Open the order and choose Reverse, then confirm. This is only possible while every unit made is still held at the location; goods sold or used since cannot be unmade.

The reversal is dated the day you reverse it. The finished goods leave at what they are held at now, the components come back at exactly what they left at, and the work is credited back out of Inventory to the accounts that absorbed it. If the finished goods are now held at a different cost (another batch was made or bought since), the difference is posted to Stock Adjustments, so the Inventory account still agrees with the stock.

Related articles

Was this page helpful?

Tell us what was missing or wrong, with the page address, and we will fix the article.