Production costing
See what it costs to make any quantity of an item - each component at what it is held at, plus the time at each work centre - before you make it.
Costing works out what it would cost to make an item from its bill of materials, without posting anything. Use it to set a selling price, to compare two batch sizes, or to find a component that has no cost yet.
Cost an item
- Go to Production › Costing, or choose See its cost on a bill of materials.
- Choose the Bill of materials. Only bills in use are listed.
- Enter the Quantity to make. It starts on the bill's batch size.
- Choose Cost it.
What it shows
Four figures at the top: Materials, Work, Total and Cost per unit.
Materials lists each component with its Qty for the quantity you are making, its Unit cost, where that cost came from, and the Total.
| Source | Where the unit cost came from |
|---|---|
| As held | The average of what is in stock, across all locations. |
| As made | The component has none in stock but has its own bill of materials, so it is costed by making it. |
| Purchase price | None in stock and no bill of materials: the item's Purchase price. |
| No cost | None of the above. Shown in red; the total is understated until the component has a cost. |
Work lists each step of the route with its Work centre, the Minutes (setup once, plus run time for each unit), the rate Per hour, and the Total. It is left out when the bill has no route.
How it differs from an assembly order
Costing is an estimate. When you post an assembly order, each component is taken out of the chosen location at what the books hold it at there, by the company's costing method. That can differ from As held, which averages across every location, and a component with no stock is refused rather than costed at its purchase price unless stock is allowed to go below zero.
Example
Costing 25 gift boxes from a bill with a batch size of 10:
| Materials | AED 1,850.00 |
| Work | AED 112.50 |
| Total | AED 1,962.50 |
| Cost per unit | AED 78.50 |
Related articles
- Bills of materialsSay what goes into making an item, for a batch of a given size, and the route it is made by.
- RoutesList the steps an item goes through to be made, each at a work centre, with setup time per batch and run time per unit.
- Work centresSet up the places work is done - a line, a machine, a bench - with what an hour there costs and the account that cost is absorbed into.
- Post an assembly orderMake goods from a bill of materials - the components leave stock, the finished item comes in at their cost plus the work, and the work is posted.
